Online Auction | REMAT - Production Equipment for Plastic Waste Sorting and Baling Line
Starts: 27 October 2026 at 11:00 GMT
Ends: 18 November 2026 at 09:00 GMT
By order of REMAT Hulladékhasznosító Zrt.Registered Office: 3580 Tiszaújváros, TVK Ipartelep 2096/3, 2096/8 hrsz. HUNGARY , ongoing business sale of Waste Equipment including a Lindner shredder, Steinert optical sorting units, screens, conveyors and baling presses.
Share:
Showing 23 of 23 lots
- LOT 8070001
![Hungary]()
Bale breaker AMIS BRT Hartner | 2015
Binding Handling & Service Fee:2500 € (EURO)
The Schütz BRT bale opener is designed to loosen compressed bales and feed the material in […] - LOT 8070002
![Hungary]()
Conveyor ZERMA
Binding Handling & Service Fee:750 € (EURO)
Working width/lenght approx.: 1,1/10m, Power supply: 400V/50Hz - LOT 8070003
![Hungary]()
Manual pre-sorting platform
Binding Handling & Service Fee:3150 € (EURO)
Manual sorting platform with 10 workstations for the pre-sorting of opened bales. - LOT 8070004
![Hungary]()
Demetallisation conveyor belts IFE MEQL 1401 S-K | 2015
Binding Handling & Service Fee:2300 € (EURO)
Conveyor belts with an IFE MEQL 1401 S-K demetallisation conveyor belt, for the removal of […] - LOT 8070005
![Hungary]()
Shredder LINDNER Micromat 2000 BW | 2018
Binding Handling & Service Fee:1600 € (EURO)
Lindner Micromat 2000 BW single-shaft industrial shredder, designed for pre-shredding and […] - LOT 8070006
![Hungary]()
Conveyor belts (3 pcs) | 2015
Binding Handling & Service Fee:2100 € (EURO)
3pcs, Various size approx: 5/3/6m - LOT 8070007
![Hungary]()
Screen IFE SM 1200x4000 F-UW20 | 2017
Binding Handling & Service Fee:3200 € (EURO)
IFE single-deck, heavy-duty vibrating screen for separating industrial waste into oversize […] - LOT 8070008
![Hungary]()
NIR optical sorting unit STEINERT Unisort P2000R | 2015
Binding Handling & Service Fee:6300 € (EURO)
STEINERT UniSort P2000R automated optical sorting unit for the separation of recyclable ma […] - LOT 8070009
![Hungary]()
NIR optical sorting unit with conveyors STEINERT Unisort P1400RF | 2015
Binding Handling & Service Fee:6300 € (EURO)
STEINERT UniSort P1400RF optical sorting system for automated separation of recyclable mat […] - LOT 8070010
![Hungary]()
Vibratory separators with conveyor VIBROTECH R1,3x3-2x10/3000 | 2015
Binding Handling & Service Fee:3200 € (EURO)
Vibrotech R13×3 vibrating classifier designed for screening and separating bulk materials […] - LOT 8070011
![Hungary]()
Conveyor belt (approx. 12 m)
Binding Handling & Service Fee:750 € (EURO)
Working width/lenght approx.: 0,8/12m, Power supply: 400V/50Hz - LOT 8070012
![Hungary]()
NIR optical sorting unit with Vibrotech T1x2,85/2,1-2x10/1110 spread vibrator and conveyors STEINERT Unisort P2800RR | 2015
Binding Handling & Service Fee:6000 € (EURO)
This lot includes a NIR optical sorting unit with Vibrotech T1x2,85/2,1-2x10/1110 spread v […] - LOT 8070013
![Hungary]()
Sorting machine STEINERT ALR 100 120
Binding Handling & Service Fee:1600 € (EURO)
Working width approx.: 1000mm - LOT 8070014
![Hungary]()
Bale press KAMPWERTH HPK 50 BSK | 2007
Binding Handling & Service Fee:1300 € (EURO)
The Kampwerth PRESTO HPK 50 BSK is an automatic horizontal channel baling press designed f […] - LOT 8070015
![Hungary]()
Bale press KAMPWERTH HPK 50 BSK | 2009
Binding Handling & Service Fee:1300 € (EURO)
The Kampwerth PRESTO HPK 50 BSK is an automatic horizontal channel baling press designed f […] - LOT 8070016
![Hungary]()
Bale press Seremat FC1550LA | 1999
Binding Handling & Service Fee:1050 € (EURO)
The Seremat 1550 is a heavy-duty, industrial horizontal waste compaction machine manufactu […] - LOT 8070017
![Hungary]()
Conveyor belt (approx. 14 m) GEPSYSTEM | 2015
Binding Handling & Service Fee:750 € (EURO)
Working width/lenght approx.: 0,7m/14m - LOT 8070018
![Hungary]()
Conveyor belt (approx. 7 m) | 2015
Binding Handling & Service Fee:550 € (EURO)
Working width/lenght approx.: 0,7m/7m - LOT 8070019
![Hungary]()
- LOT 8070020
![Hungary]()
Scale (capacity 3 t) DEFENDER 3000 ExtremeW | 2015
Binding Handling & Service Fee:250 € (EURO)
Working width/lenght approx.: 0,7m/7m - LOT 8070021
![Hungary]()
Conveyor-mounted metal detector MESUTRONIC Metron 5.0 D 600/500
Binding Handling & Service Fee:750 € (EURO)
Conveyour lenght approx.: 6m with metal detector - LOT 8070022
![Hungary]()
Conveyor belt (approx. 7 m) | 2015
Binding Handling & Service Fee:750 € (EURO)
Working width/lenght approx.: 0,8m/7m - LOT 8070023
![Hungary]()
Conveyor belt (approx. 6 m) | 2015
Binding Handling & Service Fee:750 € (EURO)
Working width/lenght approx.: 0,8m/7m
Essential Information
General Information
- Auction Dates
- Starts: 27 October 2026 at 11:00 GMTEnds: 18 November 2026 at 09:00 GMT
- Site Address
- ReMat Zrt.TVK Ipartelep Tiszaújváros3580Hungary
- Viewing Days
- 17 November 2026 at 09:00 GMT - 17 November 2026 at 13:00 GMTBy appointment only
Fees & Payment
- Currency
- EUR
- Buyers Premium
- 18% or as specified on individual items
- Payment
General Payment Information
- Per bidder, there will only one invoice be issued for all lots won in one auction/sale.
- The invoice will be in PDF format and will be emailed to successful bidders within 24 hours after the last lot in the auction has closed. Alternatively, a link will be emailed from where the invoice can be downloaded.
- Payment is due immediately on receipt of invoice unless stated differently on the invoice.
- All payments must be made in the currency stated on the issued invoice.
- The only accepted form of payment is bank transfer.
- We DO NOT accept payment by cheque, debit or credit card.
- Please reference the invoice number on the bank transfer.
- For all bidders with residence outside of the country from where the assets are being sold, Maynards Europe will collect 19% of the Asset Net total as a deposit. This deposit will be refunded in full after Maynards Europe have received proof of export.
- It happens frequently that Maynards Europe at first only issue a so-called “proforma invoice”. After receipt of full payment, collection of the items and receipt of export documentation (if applicable), the final invoice will be issued.
Goods
- Clearance days
- 01 January 1970 at 01:00 GMT+1 - 01 January 1970 at 01:00 GMT+1
- General Collection Information
- Buyers are fully responsible for the removal of the items purchased including all transport and rigging charges.
- Items only become available for collection after Maynards Europe have received payment in full, and a collection appointment has been booked with the project manager / on-site contact.
- Buyers or third-party movers must present the ‘Paid Invoice’ confirmation to the on-site personnel when collecting and removing their items. The ‘Paid Invoice’ confirmation will be issued by Maynards Europe after receipt of the full payment and will be emailed in PDF format to the buyer.
- Buyers must complete the removal of items within the clearance deadline (individually stated for each auction / sale). Removal is by appointment only.
- Removal and on-site contact information will be emailed to buyers at the same time invoices are issued.
- Entrance to the site is subject to the Conditions of Admission for customers, agents and contractors. For your protection you will be required to wear safety equipment including high visibility jackets and safety footwear as a minimum. Everybody entering the site has to undergo a short security briefing.
- Conditions of Site Admission: All Customers, agents & contractors must report to the site manager / foreman on arrival and must not proceed on to site without permission. No persons under 16 years of age will be allowed on site.
- Buyers / Transport Companies must bring their ‘Collection Note’ document to site. If you have any questions on this, please do not hesitate to contact us on +49 8151 1878 400.
- There is NEITHER lifting equipment NOR tools for dismantling available on site. Please make your own arrangements.
- Removal of items is solely the responsibility of the purchaser and/or those collecting on their behalf. This may require you to remove other items to gain access although efforts will be made to keep this to a minimum. Dismantling of machinery may be required.
- The buyer and their removal company are responsible for the condition of the site after removal of their goods. Electrical connections must be left in a safe condition and protrusions (grouting, hold down bolts / studs) must be removed and left flush to ground level. The site must be cleaned after removal and all waste must be disposed of.
- The buyer and their removal company are responsible for conducting the removal and transportation of their goods according to the standard environmental regulations.
- Removal must be carried out without damage to the site itself or any property/ items on or near the site. Liability for any such damage lies with the buyer.
- If items have not been removed by the clearance deadline, our standard Terms & Conditions apply.
- Our staff are on site to supervise and control removals only, they are not permitted to move equipment or assist with the removal in any way. We thank you for your cooperation in helping to keep yourself and others safe while on site and for aiding us in the timely removal of goods from site.
- Sales Contacts
- Auction information




















































































































































































































































































































































